by Alejandro Ibarra, Aug 29 2023
by Equipo Logykopt, Nov 03 2020
by Alejandro I, Sep 28 2020
by Logykopt Team, Apr 4 2020
We want to help in this pandemic with our manufacturing optimization algorithms.
Read moreby Logykopt Team, Apr 1 2020
Performing production scheduling in an injection molding plant is not easy. Generating a production plan that allows the continued use of the injection machines to take full advantage of the installed capacity is even more difficult.
Read moreby Logykopt Team, Mar 07 2020
Many of our Users have told us that they would love to manage other production processes, the same way they manage their injection molding processes every day with SCHEMA. Until now SCHEMA was only capable to consider integer units for the Part items.
Read moreby Logykopt Team, Jan 23 2020
Hi! We have made an update to the platform's style design framework. We also took the opportunity to make changes in the shades, iconography and elements of the views of each section. Surely, you noticed it in our navigation menu and at the top of your screen.
Read moreby Logykopt Team, Nov 14 2019
SCHEMA has been awarded the Tecnos NL 4.0 Award for its focus on Production Scheduling, Execution, and Control using advanced prescriptive analytics and optimization for plastic injection molding companies.
Read moreby Ely C. & Marco G., Jul 12 2019
Our new menu has the same content, it just changed its location now on the left side of the screen. Our new sidebar is responsive with tablets and mobile devices!
Read moreby Dev Team, Jun 12 2019
How many times have you wondered how much available stock you have to meet demand? SCHEMA now includes a Stock Coverage report which is really useful to get a snapshot of how much stock do you have to face demand for a period.
Read moreby Dev Team, Jun 5 2019
Now you can add special Tags to your Master Production Data. Classification Tags may be linked to each item in your data Catalogs. You may use Tags to group and organize your data to make a quick and fruitful follow up in the Reports.
Read moreby Jose U., May 8 2019
Now you have access to a new report with the Key Performance Indicators in a whole new comparative format. With this report you'll be able to get graphical production data sectioned by Day, Week or Month. For example, you can choose to see Daily data for a Month period.
Read moreby Emilio C., Mar 27 2019
Now you have an easy way to check for possible errors in Production Capture. Looking for errors in Production Capture –like missing data– can be difficult within a set of many records. That is why we've made a new way to check it fast without reviewing record by record.
Read moreby Ely C., Mar 22 2019
Now you have access to a brand-new Fulfillment Report. This is an amazing tool. You´ll have greater control over execution times of your production. We have been developing this new report which includes a new analysis tool of your production orders performance and fulfillment.
Read moreby Marco G., Feb 22 2019
For weeks we have been developing a feature which includes a brand-new way to classify the production scrap of your plant. The main feature is the ability to create your own Scrap Categories and specific scrap types, so these can be used later on the shop floor to capture specific scrap types along with the production data.
Read moreby José U., Feb 5 2019
On this occasion we present a new option of Confirmation of Finished Product. The essential change is that now in the Capture / Confirmation section you can register all the entries to Warehouse that you do not yet want to assign to any specific Customer Order.
Read moreby José U., Jan 16 2019
We have redesigned the Reports section with new data structures and algorithms for the calculation of quantities, times and indicators. From now on you have the ability to obtain reports and perform full analyzes for the range of dates you want to make decisions faster
Read moreby José U., Nov 8 2018
We have included a new data analysis functionality within the Program vs. Advance section. With the help of this new function, you have greater control over your production data. You can compare the programmed against the actual production faster and make decisions even faster.
Read moreby Marco G., Oct 23 2018
Now you have the possibility to configure the notifications to the email according to the Work Center.
Read moreby Ana Luisa R., Oct 05 2018
Most of the improvements were made in the internal structure, updating and improving its stability to continue strengthening this section. Given that, almost everything continues to work the same and is in its usual place. However, here we explain some of the changes you can detect.
Read moreby Ana Luisa R., Sept 19 2018
We know that sometimes it is not enough to be able to control purchased components (non-molded) at the level of Finished Product or Final Assembly. So now, you can not only control the resins, pigments and additives at part level, but you can also control all the components purchased (non-molded) that you need at the foot of the machine to make your Parts.
Read moreby Sofía G., Sept 04 2018
The convenience of being able to create, edit and organize your own list of Downtimes is now available in your SCHEMA application. Create all the Reasons for time that you manage in your plant and organize them in Categories to give them a professional follow-up and promote a continuous and efficient production in your plant.
Read more